homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

Strengthen the consciousness of the red line and promote the safe development
The publisher£ºczszjs    Release time£º2018-07-04    Hit£º12993

 June is a "safe production month", and the two standard project Department of the South District flood control and waterlogging comprehensive renovation project of the Southern District of the bell tower Economic Development Zone (North Port Street) is to carry out the policy of "safety first, prevention and comprehensive management", to comprehensively promote safety production management, safety culture construction and staff safety and health training education.

This project is located in the North Port Street of the Changzhou bell tower Economic Development Zone. The project includes the pump room (including the supporting process pipes, equipment, electrical engineering), the management room (including the supporting electrical engineering), the pumping stations to the municipal roads, and other pavement demolition, repair, cofferdam, dewatering and other measures, and so on, along with maple Road and boy on the west road lay d1650 - d2000 rainwater pipeline, access the new Fengxiang road pump station, the whole line d1650 rain pipe jacking 843m, d2000 rain pipe jacking construction 36.5m, the bottom of the pipe bottom is 4.36m - 5.17m. Now the main body of the pumping station and the main management room have been completed, and the pipe jacking project has been completed by 80%.
In order to achieve better safety management and control targets, guarantee the quality of construction and speed up the construction progress, all the management personnel work together and work together to improve the fine management and establish and improve the "four in one" project safety management system: project safety management planning, project safety management implementation, project safety inspection analysis and rectification. Summarize the corrective measures. The project department has formulated a detailed safety management system, identification and management measures for major safety and health hazards, special safety protection measures, emergency plan and emergency protection measures. In the course of construction, the project department should carry out the construction strictly according to the safety management system and requirements, and widely carry out the normal safety education and training based on "division of labor, division of specialty and division of operation", vigorously promote the standardization of safety protection, set up all kinds of safety warning signs and improve the safety and prevention of construction site. Protect the level.
The project department will combine safety production with civilized construction organically, standardize and strengthen the standardization management of construction site during the construction process, carefully compile special plans for safety and civilization construction, dust control and so on. A series of measures such as perfect flushing equipment and standardized enclosure are equipped, and safety and civilization construction runs through the item. The whole process of the management of the eyes.
¡¡
¡¡

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code£º213017 | Telephone£º0086-0519-85501558 |¡¡Fax£º0086-0519-85501558 |¡¡E-mail£ºczsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  ËÕICP±¸12078434ºÅ-1   Technical support:Public science and technology