The hot sun is like a fire. The rising temperature has brought great influence to everybody's work and life. In the construction site of Gusu Road project, the construction personnel still fight in the construction front line with high enthusiasm and conscientious attitude in hot weather. They are glorious city builders.
Since July, the main work of Gusu Road Project has been around Muhenghe Bridge. At present, the No. 0 platform of Muhenghe Bridge has been poured, and the No. 1 platform is carrying out the binding of steel caps. In the hot summer, workers wearing safety hats and work clothes busy at the site, every time they waved their arms, the face of the sweat will "jump out", with sweat like rain to describe it is not too much. Strips of steel bars are like a five-line spectrum, and steel workers are like notes that are active. They write a beautiful song of laborers with their hands as pens and sweat as ink.
City workers are not afraid of the heat, and the construction technicians on the site are equally hardworking. In order to ensure the progress of the project, they meticulously carry out daily surveying and wiring work, high temperature environment, in the process of finishing work, their clothes are always wet and dry, dry and wet. It is precisely these construction technicians and municipal workers persevere in the high temperature, our project can be completed in quality and quantity, to provide citizens with more convenient transportation.
In the face of "sauna day", the project department to ensure the construction safety and progress in hot weather, conducted a careful deployment. Firstly, the working time of the working group was adjusted to avoid the construction in high temperature period. Secondly, the dust was controlled by sprinkling water, and the site temperature was lowered. Therefore, the project department increased the working frequency of sprinkler and sprinkled water regularly to reduce dust and temperature. In order to do a good job in summer construction, the project department also prepared wind oil essence, Huoxiang Zhengqi water and other anti-heat supplies for everyone to use at any time. In addition, there are also air-conditioned rest places on the site, so that workers can have a good rest environment after work. |