Years go by and seasons run by. The expansion project of Zhangjiagang No. 4 Waterworks ushered in the climax of construction in a twinkling of an eye. With the active advancement of construction, the continuous expansion of working face, more and more construction units, the project department will take safety in production as the top priority of daily work.
It is not enough to rely solely on the inspection and supervision of security officers to carry out safety work. A complete set of management methods must be adopted. First of all, we need to improve our safety awareness, which can be divided into two aspects. On the one hand, we can identify some common risk factors, rather than ignorance, which leads to accidents. On the other hand, we need to strengthen the execution of safety work, that is, the premise of identifying dangers. Next, we must resolutely avoid and eliminate it, and do not create accidents because of luck. In order to improve the safety awareness of all the relevant personnel in the project, the project department has organized many safety education announcements. Through illustrative textbooks and vivid and detailed cases, every carefully listened manager and construction worker can have a sense and consciously carry out construction in accordance with the "Four No Injury Principle".
Secondly, for the unsafe and uncivilized behavior found in the daily safety inspection, the safety management personnel should stop it in time, and make the relevant personnel move with emotion and reason, so that they can consciously realize the possible harm of unsafe behavior, so as to arouse enough attention. Those who still violate safety production regulations after being advised must be criticized and educated, and effective punishment measures should be taken according to the situation, so that they can deeply understand the serious consequences of unsafe operation. For unsafe construction, site managers should grasp once at a time, punish once at a time, poke the pain point, and never let it go without rectification.
Finally, for those who actively implement safe and civilized construction, the project department has certain incentives, so that the rewards and penalties are clear, so as to fully mobilize everyone's enthusiasm for safe and civilized construction. |