On the morning of June 27, the opening ceremony of Caoshang Road Park Bridge, which was constructed by our company, was held on the main bridge deck in the middle of the bridge span. Gu Weiguo, Deputy Secretary of Wujin District Committee and Secretary of Jingkai District Party and Labor Committee, Chu Xiaoping, director of Kaikai District Management Committee, Zhou Hongwei, director of Kaikai District Construction Bureau, Wu Wenjun, general manager of Dongfang Investment Company, and Zhao Xisheng, chairman of the company, attended the opening ceremony (as shown in the figure).
Caoshang Road Sanbiao Park Bridge is 1115.8 meters long and 35.6 meters wide. It has six lanes in both directions. The bridge starts on the east side of S232 and adopts assembled partial prestressing concrete continuous box girder. In the construction process, the project department pays attention to safety and civilization, and adopts fine quality management.
In the process of bridge construction, the Changhe high-speed section of bridge overpass is the key node of the whole project. In order to ensure the normal construction of the upper span, the project department actively communicates and coordinates with the construction party and the high-speed management department. After five coordination meetings and two expert demonstration meetings, it finally decides to adopt the construction scheme of erecting portal protective shed. After the implementation of this scheme, the safety, quality and progress of bridge overpass construction are guaranteed, and the traffic pressure of expressway is greatly reduced.
To develop economy, transportation needs to go ahead. Caoshang Road will effectively enhance the links between Qishuyan and Yaoguan, Henglin and other townships after opening to traffic. As a part of Shanghai-Nanjing regional innovation corridor, Caoshang Road will make the links between Jingkai District, Changzhou and Wuxi closer and further promote the construction of Jiangsu Southern Modernization Demonstration Zone. |